SAP Signavio SOC 2 Bridge Letter Package
SAP Signavio regularly provides a bridge letter for the SAP Signavio SOC 2 report. Bridge letters are intended to cover the gap between the end date of the referenced report and the issue date of the bridge letter. This bridge letter package covers the period from April 1st, 2025, to December 31st, 2025.